Extract from a sample report of an on-site building audit for an apartment building. We go through this overview with you in the final meeting – for your building, with your figures.

Calculation example with sample data. Not a real client, funding not verified.

Your building audit · example

Sample Street 12, Berlin

Condominium owners’ association · 12 residential units + 1 commercial unit · built 1972 · 940 m² · gas boiler from 1994

  • Lower energy costs
  • Replace the heating
  • Enable charging
  • Use funding

At a glance

Investment range
€208k–332k
before funding
Funding
€61k
not verified, 23% of the midpoint
Annual net effect
€12,921
Savings + revenue − operation
Payback
16.1 years
6.2% p.a. simple return
CO₂ reduction
35 t/yr
Indicative value

Measures and impact

MeasureInvestmentFundingImpact per yearAssessment
Photovoltaics approx. 47.3 kWpEast-west roof, roofing renewed in 2015€52k–76k–€7,077 savings
€1,730 feed-in
Potential identified
Heat pump approx. 80 kWGenerously sized radiators, flow temperature 62 °C€144k–224k€55.2k€5,072 savingsPotential identified
4 charging points with load managementPrepared for expansion to 10 charging points€12k–32k€6kCharging offer for owners and tenantsPotential identified
Tenant electricity / building supplyClarify metering concept and operatorRevenue depends on the participation rate (assumed 50%)Examine in detail
Building envelopeFaçade poor, roof and windows averageValues after heat load and U-value calculationExamine in detail

Your roadmap

  1. 2026
    4 charging points with load managementResolution at the owners’ meeting
  2. 2027
    Photovoltaics and heat pumpPriority 1, funding application before awarding contracts
  3. 2027
    Set up tenant electricityPriority 2, after clarifying the metering concept
  4. 2028
    Envelope measure after specialist planningPriority 2

Impact for tenants

Cost allocation
€0.9/m²
per month, after funding
Energy cost relief
€0.4/m²
per month
Balance of gross rent
+€0.5/m²
Tenants pay more net

Inconvenient results belong in the report too. Here it shows that the envelope and tenant electricity should be examined in more detail before the cost allocation is fixed.

Obligations and deadlines we keep an eye on for you

  • Boilers older than 30 yearsCheck the replacement obligation under the GEG.
  • Funding application before project startApply for grants before signing contracts.
  • Grid operatorRegister the heat pump and wallboxes above 4.2 kW (Section 14a EnWG).
  • Owners’ resolutionPrepare the resolution proposal and cost framework in good time.

Indicative survey of the building and its potential. Figures are ranges based on the stated assumptions. Funding amounts are unverified until approved by the funding body. No commitment regarding funding, taxes or loans. Technical approvals are given by the responsible specialist planners.

And what is in your building?

The starting point is a free initial assessment by video. In the on-site building audit we prepare this report for your property – in writing within 10 working days of the site visit. In Berlin and Brandenburg this is also free of charge.