BUILDING ENVELOPE & REFURBISHMENT
Technical transformation extends beyond electricity, heating and charging. The building envelope affects energy demand, system sizing, comfort and long-term running costs. We therefore consider windows, doors, roofs and façades as part of the whole.
Windows & doors
We assess replacement or improvements in relation to heat losses, building standards and maintenance already planned.
Roof & insulation
Roofs and top-floor ceilings are considered alongside PV planning and building condition so that measures work together technically.
Façade
Façade and insulation measures are assessed by energy impact, investment requirements and lifecycle, rather than automatically assuming a complete refurbishment.
Procurement & delivery
VOLQID can coordinate suitable specialist partners, consolidate procurement options and organise cost-effective delivery. The aim is a dependable solution at competitive cost.
The necessary or financially worthwhile measures depend on the building and the extent of planned changes. We assess the envelope during the building assessment and develop a coordinated refurbishment roadmap where needed.

RENOVATION GUIDE · 27 OCTOBER 2026
Plan insulation, windows and financing together.
Start with a target for the whole building. Compare heat losses, maintenance and financing before selecting individual products.
What needs to change?
Walls, roof & basement
Record existing construction and insulation. Compare façade insulation, cavity insulation or carefully designed internal insulation. If the attic is unheated, insulating the top-floor ceiling may be appropriate; a heated attic calls for a roof assessment. Check basement ceilings, moisture, roof condition and planned PV together.
Windows, doors & ventilation
The Uw value describes the complete window, whereas Ug describes the glass only. Frames, edge spacers, airtight installation, thresholds and joints matter. Coordinate window reveals with future façade insulation. Assess thermal bridges, summer shading and ventilation when improving airtightness.
Which U-values apply?
Lower U-values mean less heat transfer. The table covers selected statutory maximum values for specified alterations to ordinary residential buildings, in W/(m²·K). It is not a universal obligation to replace every existing component. Statutory minimum standards and grant requirements must be checked separately.
| Component | Maximum |
|---|---|
| External wall | U ≤ 0,24 |
| Pitched roof / top-floor ceiling | U ≤ 0,24 |
| Roof with waterproofing | U ≤ 0,20 |
| Basement ceiling, cold side | U ≤ 0,30 |
| Standard windows / French doors | Uw ≤ 1,30 |
| Roof windows | Uw ≤ 1,40 |
| New external doors | U ≤ 1,80 |
Special glazing, sliding doors, protected buildings, limited insulation depth and floor build-ups from the heated side can follow different rules. Insulation thickness depends on the material and existing assembly. A whole-building efficiency target may require better performance. Current BEG technical requirements must be verified before funding is planned.
Energy rating and efficiency-house standard
The A+ to H energy-certificate rating concerns final energy. A KfW efficiency-house assessment instead compares primary energy demand and transmission heat loss with a reference building. Rating B does not automatically mean efficiency house 55.
Efficiency house 55 example: at most 55% of the reference building’s primary energy demand and 70% of its transmission heat loss. Both criteria must be met; current EE/NH funding conditions also apply.
- Collect plans, energy certificates, consumption data and previous renovation records.
- Calculate coordinated variants for envelope, heating, hot water and ventilation.
- Confirm the target through a whole-building assessment. Window replacement alone cannot guarantee a rating upgrade.
- Coordinate connections and recalculate the heating load for the planned renovation.
An individual renovation roadmap helps sequence work; it does not replace funding or lending approval.
Can the entire renovation be financed?
KfW 261 · whole-building renovation
For an eligible efficiency-house renovation, KfW currently states up to €150,000 per residential unit. An approved energy-efficiency expert is required. Eligible stages, EE/NH conditions and current application rules must be confirmed.
KfW 358 / 359 · individual measures
A supplementary loan of up to €120,000 per unit can support measures with an approved BEG grant that has not yet been paid. Full eligible costs may be financed within the limit; any grant temporarily financed must be repaid as required after payment.
Example only: six recognised units × €150,000 gives a theoretical ceiling of €900,000 under 261. Eligible costs of €750,000 fall below this ceiling; costs of €1,050,000 exceed it by at least €150,000. This arithmetic is not an eligibility or loan decision.
Separate eligible energy works and related costs from other modernisation. The financing partner checks creditworthiness, collateral and lending approval. Confirm application and contract rules before commissioning; the supplementary loan follows its own grant-first procedure.
What happened to the GEG reform?
Checked 27 October 2026: the German government states that the main provisions of the Buildings Modernisation Act (GModG) have applied since 29 July 2026, replacing the former GEG. This is an enacted change, distinct from further proposals. Component requirements, retrofit duties and exemptions still need project-specific review. The reform does not itself guarantee renovation finance.
Start with your building.
Bring the energy certificate, year of construction, unit count, plans, consumption and information on the envelope and heating. We structure the next steps with suitable specialists: survey, renovation options, energy target and financing.
Request an initial assessment →Plan renovation and parking infrastructure together
The enacted GEIG amendments take effect on 1 January 2027. Project-specific requirements and transitional rules must be checked. Major renovations should include early planning for parking spaces, pre-cabling, cable routes and electrical infrastructure. This is not a universal retrofit obligation for every existing apartment building. Statutory duties and voluntary grant-eligible works require separate assessment.
Charging grants until 10 Nov →Sources & editorial date
27.10.2026 · General guidance for residential buildings in Germany. Project-specific evidence and conditions at application govern. No finance commitment.
Additional specialist services
Explore further where needed.
On request or where needed, qualified service providers can complement the assessment of your building. These services are optional and are not part of the free initial assessment.
- Thermography
- Blower door test
- Thermal bridge calculation
- Heating load calculation
- Hydraulic balancing
- Energy consulting / individual renovation roadmap (iSFP)
VOLQID identifies needs, obtains quotations from qualified service providers, compares scope and terms, and coordinates the process. You select and commission the service provider directly. Scope, costs and dates are agreed with the provider in advance.